9.16.2009

Nevergreen terrace [s]



R, Dan and Dave came down this past weekend. Besides the requisite Halo, Winner, surfing, and tasty food/drink, we were on a mission to clear the rocks out of the second terrace. It's difficult to describe the size of the task. But I should add that Dan cleared out the three juniper stumps that confounded the other two a year ago. Also the pier for the late satellite dish was hammerdrilled down to size.

The surf session at Fletcher's was pretty exciting. Cleanout sets in September, E says he had an overhead. Warm water, too.



Now that the lower portion of the wall is exposed, I'm inclined to give it a fresh layer of paint since that light blue and tile is ugly. I'm inclined to go very dark green to match the house/deck trim and work well with the red brick.

We planted some grass seeds and I'm keeping it very damp. Out front I've set up the drippers - keeping them pretty close together. They do a good job of wetting down the whole area. I just need to partially bury them, though the grass will do a good job of that.

Labels: , , , , , , , , , ,

3.01.2009

I red myself [s]



For whatever reason I decided to do the fences this weekend. Well, I decided to start the fences. I'm maybe half done.



Same thing as the deck, and it matches pretty well with the red brick. For prep, I diluted the Behr finish stripper and pump-sprayered it on. Then I hit it with a brush followed by the hose. It worked pretty well but took some serious effort.

Some areas are a bit dark and will need a second coat of stain. I was getting about sixty planks (one side) out of each gallon. I estimate seven gallons for a single coat.

Many thanks to Jessica and her gymnastic painting abilities, Jessica Lee Pool House looks good next to Rob Queenin Memorial Pool and the D. Lane Juniper Stump Grove.



The deck can now be walked on for the opposite-angle view. I need to start thinking about sweet outdoor lighting.



I've spent some time organizing the storage room. I swapped out two flourescent fixtures, one broken and the other an unnecessary 100w. The replacement fixtures illuminate such areas as the paint/chemicals alcove on 50w.

Labels: , , , , , , , , , , , , ,

9.11.2008

Last of the painting, start of the flooring [s]



The hallway, stairway, and unnamed area adjacent to the kitchen is ready to be primed. And that will be the last of it.

I bought the flooring for the entryway, living room, dining room, and hallway. Installation will probably be this weekend, as the trim pieces make their way down from Oregon.



Labels: , , , , , , , , ,