The master bathroom is progressing steadily.




If I can reroute the water pipes to their new home in the cornered-off section, I can finish the plywood paneling (then roofing felt and monkey board). The 45 degree angle opens the shower up quite a bit and should make it easier to add body sprayers. It won't be quite as glamorous as Jeff's suggestion, which is regrettably too wide.





I've been through numerous sketches, this is the working plan. I can draw on experience for the shower room and sink. Installing a tub would require a new drain, something I haven't done. Thankfully the area is easy to get to, rather than being under the house or in the slab. Additionally the sink line can be used for the tub, so that's nice. Whatever the case, the tub won't be part of the first pass.



The window adjoining the skylights adds a ton of light to the room, I'm going to need to do some research into acrylic for this. That will lend to possibly installing a small partition to prevent overspray from hitting the toilet. And I'd like to find a sliding door inset with translucent acrylic for the shower room.



I was browsing Lowe's site and found quite a few soaking tubs up to seven feet long.




Removing the closet really opens up the room, to say nothing for how much it imposed on the bathroom - when there was a bathroom. Taking out the flimsy structure revealed a 6' x 4' nook, and that even some of the exterior walls were not insulated. The nook is pretty useless but does beat the attic for storage. Hmm.




Comments

How about a loft staircase/bookshelf where the closet used to be?

Chris

It wouldn't store much. And you'd have to crawl inside.



2009.12.10

December

Wayne and I throw a baby shower and a dragon attacks me in Dragon Age.
2010.01.01

Christmas weekend

Kafka drives a Bobcat and gets a bunch of new rawhides.


Related / internal

Some posts from this site with similar content.

Post
2010.02.24

Garage doors

Swapping out old garage doors and figuring out how to pipe body sprays the right way (closed loop).
Post
2009.10.25

One year

Gutting the master bathroom.
Post
2012.10.03

Week of tile

Tiling the master shower.

Related / external

Risky click advisory: these links are produced algorithmically from a crawl of the subsurface web (and some select mainstream web). I haven't personally looked at them or checked them for quality, decency, or sanity. None of these links are promoted, sponsored, or affiliated with this site. For more information, see this post.

Has a preview image link and yet 404 :/
www.laurelhurstcraftsman.com

Laurelhurst Craftsman Bungalow: Sewing Room Before and After

OK, it's not quite after because I still have some boxes to unpack, but it's pretty close. I hope I don't regret unpacking the fabric becaus...
Has a preview image link and yet 404 :/
www.livingvintageco.com

Reclaimed Wood, Paint and Stain = Progress Made in our Bedroom - Living Vintage

OK, we have been working hard trying to get our master bedroom done so that we can move back in and start enjoying our room again. We have finished several projects so far, and I wanted to bring you up-to-date on what we've done. The first thing we did after removing the drywall and repairing
www.letsaddsprinkles.com

Let's Add Sprinkles: Building A Doll House

Let's Add Sprinkles is a DIY and decor blog with lifestyle tidbits sprinkled throughout.

Created 2025.11 from an index of 991,448 pages.